Sprint Capacity Calculator
How many developers are working on this sprint?
How many days is this sprint? [1-30]
How many story points are rolling over from the previous sprint?
How many points of on-call time during this sprint?
Add planned time off and activities that will affect team capacity
Current Configuration
Team Size5 Devs
Sprint Duration5 Days
Rollover PointsNone
On-Call TimeNone
PTO & ActivitiesNone
Sprint Capacity
Base Capacity5 devs × 5 days = 25.025.0
Total CapacityTotal Capacity = Base Capacity - PTO & Activities25.0
Configuration Manager
Current Configuration
Default Configuration
0 total
Saves configuration to localStorage for backup and reuse purposes.
Configuration is automatically loaded from localStorage on page load.
Use Export to download configuration as a file, or Import to load from a file.