Sprint Capacity Calculator

How many developers are working on this sprint?

How many days is this sprint? [1-30]

How many story points are rolling over from the previous sprint?

How many points of on-call time during this sprint?

Add planned time off and activities that will affect team capacity

Current Configuration

Team Size5 Devs
Sprint Duration5 Days
Rollover PointsNone
On-Call TimeNone
PTO & ActivitiesNone

Sprint Capacity

25.0 Points
Base Capacity5 devs × 5 days = 25.025.0
Total CapacityTotal Capacity = Base Capacity - PTO & Activities25.0

Configuration Manager

Current Configuration

Default Configuration

0 total

Saves configuration to localStorage for backup and reuse purposes.

Configuration is automatically loaded from localStorage on page load.

Use Export to download configuration as a file, or Import to load from a file.